To date, the Air Bersih campaign has successfully
Built
Benefiting
Contributed
320 Residents
2022
1,531 Residents
2023
130 Residents
2024
Phase 01
Successfully supplied clean water to 1 village at a cost of RM350,000.00.
Phase 02
Successfully supplied clean water to 4 villages at a cost of RM1,427,240.00.
Phase 03
Successfully supplied clean water to 1 village at a cost of RM309,000.00.
TYPE OF ASSISTANCE
Treated and filtered clean water supply
Kampung Bukit Batu, Sik, Kedah (Tabung Haji)
This tube well project successfully united three villages – Kampung Bukit Batu, Kampung Bukit Berangan and Kampung Kubang – with the full support of the residents.
Groundwater is channeled to 145 houses through a 4.5 km pipeline installed through a gotong-royong initiative with Yayasan Ikhlas, Persatuan Anak-Anak Sik, the village committee and the local community. The main tank with a capacity of 51,756 liters, ensures a water supply for 309 hours or 13 days a month.
Initial Phase
Needs Assessment
- The clean water supply issue was identified through joint assessments with the community and local leaders to understand their needs.
Research Phase
Site Survey and Planning
- Site visits were conducted to assess the geography, water sources, and pollution risks. Planning was carried out based on population data and suitable technology.
Preparation Phase
Fundraising and Resource Mobilization
- Funds from Tabung Haji (TH) were used to cover the project costs, with construction materials such as pipes, tanks, and pumps provided.
Implementation Phase
Building and Testing
- The clean water system was built with community involvement. Testing ensured that clean water was delivered smoothly and all components functioned properly.
Monitoring Phase
Training, Follow-up & Maintenance
- Residents were trained in system maintenance. Regular monitoring is conducted to ensure the system functions continuously and efficiently.